Floor Trial Timelapse

From June to November 2013, work was taking place in the North aisle of Bath Abbey. This area which makes up 5% of the Abbey's entire floor was restored and stabilised, saving it from collapse. A new underfloor heating system was also installed.

One of our Vergers, Tom Douglas, set up a time-lapse camera to capture the process and the different stages of the work. Watch to find out more!